Sélectionner Une Page

POWERMAX · HORIZON EUROPE PROJECT · 2026-2030

Maximizing Cross-Grid Integration and Optimization of Long Duration Energy Storage to synergize Revenue Streams

PowerMAX is an international collaboration of 24 partners across Europe and the Americas working to accelerate long-duration energy storage by integrating multiple technologies, open-source tools, and real-world demonstrators. Over 2026–2030, the project will develop advanced modelling systems to show how hydrogen, molten salt, and Li-ion storage can strengthen renewable-based power grids, improve flexibility, and support a secure, decarbonised European energy system.

24

Partners

11

Countries

€8M

Budget

2026-30

Duration

THREE TECHNOLOGIES, ONE SYSTEM

Long-duration storage, built for every grid

PowerMAX integrates hydrogen, molten salt and lithium-ion storage into one modelling and revenue-stacking framework, tested across real demonstrators.

H₂
Hydrogen

Green hydrogen storage

PEM electrolysis and green hydrogen production paired with grid services, from Modena's Hydrogen Valley to cross-regional roll-out.

MS
Molten Salt

Molten-salt thermal storage

Two-tank molten-salt CSP storage, proven at Gemasolar with 15+ hours of dispatchable, round-the-clock renewable power.

Li
Li-ion

Lithium-ion battery storage

Fast-responding batteries stacked with EV charging and PV canopies, buffering peak load without costly grid upgrades.

PROJECT OVERVIEW

Maximising the value of long-duration storage

Bringing together 24 partners from 11 countries in Europe, North America, and South America, PowerMAX aims to maximise long-duration energy storage (LDES) value by integrating diverse LDES technologies, open-source tools, and real-world demonstrators to enable revenue stacking, de-risk investments, and accelerate global, cross-regional renewable-based power systems.

PowerMAX focuses on three LDES technologies — hydrogen, molten salt and lithium-ion batteries — with demonstrators in European power grids and uptake cases in the Americas. With a budget of €8M and a duration spanning from June 2026 to May 2030, PowerMAX will develop a suite of modelling tools that combine high-resolution market simulation, grid expansion analysis, and techno-economic optimisation of storage technologies.

These tools are designed to represent multiple market timeframes and evaluate how LDES contributes to flexibility, system adequacy, and resilience — accelerating the transition toward a secure, decarbonised and future-proof European energy system. More information on the project is coming out soon.

Budget

€8,000,000

Duration

Jun 2026 - May 2030

Coordinator

NTNU, Norway

Consortium

24 partners - 11 countries

MEET OUR PARTNERS

24 organisations. 11 countries. One common ambition

A consortium spanning Europe, North America and South America — universities, utilities, TSOs and technology providers working across three LDES demonstrators and uptake cases.

Consortium

CNET

PRODUCAO